VoyForums Notice -- Quick Contributions:
Donate $10 to the Red Cross: Text the word REDCROSS to 90999
Donate $10 to the Salvation Army: Text the word STORM to 80888
* The charge will appear on your cellphone bill.
[
Next Thread |
Previous Thread |
Next Message |
Previous Message
]
Date Posted:20:41:08 04/29/06 Sat
Myself, Jerry Heitman, Jeffery Jewers and Wade M. worked the east side trails today. Our safety meeting form was left tacked to the cork board at the right of the Station main front door. Started at 9 am, Here is our report:
1.) Saw cut several 2 inch - 6 inch size trees down across trail 4 at 0.2 miles up from RC road.
2.) Trail 4 - raked in drainage rolling dips and drainage cuts at two places at 0.4 miles up from RC road. Also drained another area in about 0.6 miles from RC road
3.) Saw cut small 2 inch tree fall across trail 4 about 2 miles in from RC road. Wade rode his bike up there and hand cut these trees.
4.) RC Road stopped and Saw cut two 2-3" trees across road just below 12N79C intersection.
5.) hiked up into trail 9 above RC road and 121N79C: We drained 4 water filled multi-ruts areas. We drained 4 more water filled holes and cut in about 5 rolling dips with wide drainage to the side to protect down hill trails.